you are in: tram -> zurich -> news -> news item

 

Latest news

The latest news item was posted 1522 days ago:

22.09.2020 :
Temporary change of web domain

08.09.2020 :
Ceneri Base Tunnel opens

08.09.2020 :
Liechtenstein S-Bahn rejected

08.09.2020 :
Flexity not yet in service

08.09.2020 :
Zürich's first Flexity

older news items

all news for current year index, on one page

This website:

news search.

Zürich tram home page.

photos.

events diary.

Zürich tram links.

guestbook.

Depot Hard rebuilding

filed on: 11.08.2020 (11th Aug 2020)

The rebuilding of Depot Hard (that is the depot by Escher-Wyss-Platz) will lead to total closure of the depot for trams from January 2021 for the duration of the work. This will lead to a pinch in terms of stabling space (on top of the present vehicle shortage).

The depot is to be totally rebuilt with a residential block to be built above the tracks on the rear part of the site. The landmark art-deco main building with its integrated appartments is being retained, but as far as I can make out the more inconspicuous oldest part of the depot, dating to the Industriequartier Strassenbahn, is being demolished.

source: bahnforum.ch


The river side of the site. I understand the track here will be removed and a riverside walkway created.



The Hardturmstrasse side of the site. I believe the building with the arched windows in the middle of the first view is part of the original Industriequartier Strassenbahn depot.


The rear of the depot where the new residential block will be built.


This news item is from the 2020 newslog.


search Zürich tram news archive
news index for 2024
all news for current year
Zürich tram homepage


to link to this item please use:

http://www.proaktiva.ch/tram/zurich/newslog/newsitem.php?year=2020&item=110820