|
Latest news news index This website: news search. | |
Lightram deliveries complete filed on: 12.12.2012 (12th Dec 2012) Delivery of the Hess LighTram3 trolleybuses 78-89 is complete, permitting headways on route 32 to be stretched to six minutes with the timetable switch of 8th December. In total 29 double-articulated trolleybuses are now available (61-89) – the first batch of 17 having been delivered in 2007-2008. The first of the 21 new single-articulated Hess Swisstrolley4 units is expected before Christmas. It will be numbered 162 following on from Swisstrolley3 144-161. Mercedes/ABB O405 GTZ units withdrawn so far include 101, 103, 107, 117, 134 and 139. Previous reports of 102's withdrawal were somewhat premature. source: trolley:motion The same news site also presents images of the first Swisstrolley4 for Limoges, which is fitted with a "tram-like" front end. The Zürich examples, in contrast, will look much like their Swisstrolley3 predecessors. The Limoges images can be seen here (trolley:motion website).
This news item is from the 2012 newslog.
search Zürich tram news archive
to link to this item please use: | ||
|