Bern: Regional Tram
The study for Bern's proposed regional tram line (Schliern - Ostermundigen) shows this wil cost 550 Million Franks rather than the 260 million projected earlier. A tunnel will be required to reach the Rüti terminus on account of the gradient that would otherise be required. Still to be defined is how the tram will cross the city centre. As an additional tram line is not desired on the Marktgasse, a second cross-city alignment is required and has not yet been identified. 20 Minuten (Bern edition)
this item was added on 20.01.2011 (4844 days ago) |