|
More power for trolleybuses
VBZ is also to spend 13 million Franks on strengthening the power supply of its network. The use of longer trolleybuses as well as air conditioning are leading to an increased power demand. The improved power supply will however also permit cost savings through the improved ability to absorb power from regenerative braking. By 2020 these savings could reach a million Franks a year. VBZ has 526 wired kilometers of which 222 for the trolleybus.
this item was added on 27.05.2011 (5319 days ago) |