|
Latest news news index This website: news search. | |
Double deck Talgo clarification filed on: 07.03.2007 (7th Mar 2007) In the news item on the double deck tram poster, I mentioned that Talgo had proposed a double deck train with gangways on both levels, but that the concept had never been tried in practice. A correspondant from Finland has pointed out that following Talgo's failure to secure the Zürich S-Bahn order, partly on account of the lack of prototype experience, a non-motored prototype was built (pictures: 1 and 2).
This news item is from the 2007 newslog.
search Zürich tram news archive
to link to this item please use: | ||
|